国产一区二区在线亚洲中文在线-国产一区二区在线影院-国产一区二区中文-国产一区二区中文字幕-国产一区二区最新免费视频-国产一区二三

Contact UsMore>>

Jiangsu Tianli Steel Structure Co., Ltd.

General Manager: Mr. Zhu Hongjun

Phone: 0511-88135999

Contact: Mr. Chen Helin

Phone: 0511-88131777

Mobile: 13952238816

Fax: 0511-88131118


News

Let you know how to install the lightning tower?

Author:admin Time:2018-11-12 10:41:00
If you bought the lightning tower, you can ask the manufacturer to teach you. If it's cheap for you, you can refer to the national standard atlas. The lightning tower generally saves 300 kg by two, 600 kg by three, 870 kg by four and 1200 kg by five. In general, the equipment of lightning tower is hoisted by trucks and cranes from foundation construction to vertical tower, which can save labor and time and speed up the progress of the project. But this can only be done in a place where the environment is better, where both the truck and the crane can enter the facility. In practice, many cases, such as mountainous areas and places with poor environment, can not use the construction of lifting vehicles and cranes.
The following is how to finish the artificial equipment of lightning tower.
Personnel arrangement:
1. Foundation construction: 1 person for concrete mixing and pouring, 4 for manual work.
2. Artificial equipment: one crane worker, two shelf worker and five manual worker.
3. On-the-spot processing: skill handling for one person. 2. Construction: 1. Foundation construction: two single-wheel or two-wheel concrete trucks, six shovels, two picks, one hammer and one iron braze. 2. Artificial equipment: two hand-plank hoists, one three-minute wire rope 30-60 meters (matched with hand-plank hoist), two fixed pulleys per ton, two steel wire suspension rope locks, five six-minute ropes (40 meters each), two pine poles 4-6 meters (_8-18 cm monotonous and not stale), and a number of No. 8 wire.
Two. Construction
1. Foundation construction: In general, the base of lightning tower is described according to the number of lightning tower nodes, and the embedded parts and the depth of the foundation are described. Then, according to the practical situation on the spot, appropriate things and workers are selected to carry out the foundation construction. The curing period of concrete is more than one week.
2. Artificial equipment: equipment that can be used for lightning tower after concrete curing period. Firstly, the supporting lightning tower suitable for foundation buried parts is manually transported to the foundation site, and the construction of artificial equipment is arranged by professionals.
3. Manual equipment method (holding pole method)
1. Prepare and fix the holding pole: Fix a ton of fixed pulley with No. 8 wire to the top of the pine pole 4-6 meters (holding pole), then put the hand board hoist suspension rope through the fixed pulley, and tie three pulling ropes to the top of the holding pole for the vertical of the holding pole. The hanger fixes the holding pole vertically at the base of the tower for the manual lifting of the first lightning tower.
2. Lifting construction arrangement: In the first section, the lightning tower is lifted manually. The lifting rope and hand plate hoist are fixed by the crane worker, and three people (manual worker) are arranged to manage the three pulling ropes to stick to the vertical of the holding pole. Two people (manual worker) are also required to bolt the lifting rope to the lifting part of the first lightning tower for hoisting, and one pulling rope is used to hoist the lightning tower. Line-to-line alignment of lightning tower. At this time, the first lightning tower can be lifted manually by crane control hand-plate hoist. When the first lightning tower is vertical, the lightning tower and the foundation can be buried by adjusting force. After checking, the lightning tower can be fixed with ready bolts immediately. At this time, the first lightning tower equipment is completed. Artificial lifting of the second, third, fourth and fifth sections of lightning tower is different from that of the first section, which is the fixing of the holding pole. It fixes the holding pole on the top of the first section of lightning tower with No. 8 wire, and then the other methods are the same. However, due to the high altitude operation, the personnel of the docking lightning tower are replaced by the erectors.
主站蜘蛛池模板: 黄三级片网站视频 | av一区二区三区在线观看 | 黄网站免费播放不卡 | 国产伦码麻豆一二三四区 | 高清中文字幕在线,不卡中文字幕 | 久久久三级国外久久三级 | 久草热视频在线观看 | 日本亚欧乱色视频大全 | 国产成人影片在线 | 国产在线中文 | 日韩美在线 | 午夜97体验区 | 1区 2区 3区不卡黄色片丶 | 欧羙日韩精品人妻在线一区 | 91无码偷拍精品一区二区三区 | 午夜福利韩国黄色视频 | 中文字幕69 | 麻豆传媒高清无码免费国产 | 东京热高清无码 | 成人伊人 | 久久福利500 | 国产裸体永久免费无遮挡 | 三片黄色三片插干毛片 | 日本高清不卡一区 | 亚洲成人电影专区 | 国产白丝精品爽爽爽爽爽爽 | 美女视频全黄的 | 无码日韩三级 | 日本在线视频网址 | 日本欧美一区二区 | 激情小说综合网 | 国产精品国产国产av | 国产精品久久久久久久免牛肉蒲团 | 亚州A片av无码一区二区三区 | 91精品国产综合久久香蕉第1集 | 香港成人免费视频网址大全 | 国产人妻久久久久久影院 | 亚洲人成一区二区三区 | 日本一本道视频网站 | 免费无码婬A片在线视频夜网站 | 日韩无码午夜电影 |