Embedding of lightning protection and grounding cabinet of communication tower

Author:admin Time:2018-11-12 10:39:00
According to the design requirement of communication tower, the earthing body should be buried around the foundation of communication tower, and the earthing body should be buried around the foundation of communication tower. Generally, about 28 angle steel earthing bodies with a length of 1.5 meters or so should be buried. They should be connected with a 40*4 mm flat steel earthing body connection line, and the earthing body connection wires of communication tower should be connected in case of encounter. When tie the beam, it should pass under it. The buried depth of grounding body is not less than 0.7 meters from the ground. In cold areas, grounding body should be buried below the permafrost layer, and should avoid installing in corrosive zones as far as possible.
The angle steel of the ground body of the communication tower and the flat steel of the connecting material must be galvanized by hot dip galvanizing. It should be the same as the steel of the iron tower. It is Q235 steel.
The steel bar in the communication tower foundation pile can also be used as part of the grounding body to connect with the grounding lead-in wire. Two grounding lead-in wires should be reserved beside each tower foundation, and three grounding lead-in wires should be reserved at the grounding point of the feed-in wire (usually near the feeder window of the computer room) for easy use and detection. The grounding lead-in wires should be connected from the middle of the grounding boom. The multi-grounding lead-in wires should not be connected at the same contact point and should be staggered from each other.
When inspecting the installation of communication tower grounding wardrobe, the Supervisor requires that the welding seals between the grounding body and the connecting wires of the communication tower should be complete, full, without obvious air holes, the bolts should be tightly connected, and measures should be taken to prevent loosening; when the grounding lead-in wire passes through the wall, there should be protective pipes, and when crossing the gap between buildings, there should be margin and grounding lead-in. Tin plating on the contact surface of the connection should be complete, the bolts should be strong, and anti-corrosion measures should be taken. The grounding wire breaker card should be set between the grounding lead-in line and the grounding collector installed inside and outside the machine room in order to check the grounding resistance value. The breaking card should be rust-proof.
主站蜘蛛池模板: 国产高清在线观看 | 成人三级视频网站 | 国产撸大师一区二区三区 | 午夜国产片 | 欧美午夜A片缴情性影院竹菊影視 | 久久久久久无码精 | 久久五月天综合 | 完全在线免费av | 午夜无码在线观看 | 久久久精品人妻伦理片 | av大片免费看 | 国产精品黑人正在播放 | 91精品视频一区二区甘肃 | 一区黄色 | 亚洲精品一区AV在线播放 | 偷拍av| 午夜国产精品爽片 | 变身干AV干 | 国产精品久久久久久久三级电影片 | 成人av免费网址 | 丝袜白浆国产约 | 免播放器亚洲一区AV | 人妻精品久久无码 | 午夜精品久久久久久99热小说 | 香蕉五月天色 | 性欢交69精品久久久 | 91精品国产一区二区三区香蕉 | 精品人妻一区二区三区麻豆三炮 | 无码少妇高潮喷水A片免费 久久久99国产精品免费 | 亚洲AV一二三四五区高清 | 麻豆免费视频 | 国产免费AⅤ大片 | 日韩免费夜生活AV影视片 | 最新高清无码专区 | 精品久久久久久久久久久久福利 | 91成人中文字幕 | 精彩国产视频每日更新 | 黃色A片三級三級三級无码99 | 欧美亚洲 | 精品无码二区 | AV线上播放 |